Barmaan Trading Company

我们的业绩

项目案例

近期在炼油厂、管道、石化装置及电力设施领域完成的精选项目 — 每一项结果均全程可溯源并符合相关标准。

Refinery Instrument Calibration Campaign2024

客户: Kar Group

Refinery Instrument Calibration Campaign

Erbil, Iraq

Full plant shutdown calibration of 1,200+ pressure and temperature instruments, all traceable to NIST/UKAS.

Petrochemical Safety Valve Testing2023

客户: Zagros Petrochem

Petrochemical Safety Valve Testing

Sulaymaniyah, Iraq

On-site pop-testing and recertification of 340 pressure safety valves across the olefins unit.

Cross-Country Pipeline NDT Inspection2024

客户: North Gas Co.

Cross-Country Pipeline NDT Inspection

Kirkuk corridor

Ultrasonic and radiographic weld inspection across 85 km of new 24-inch gas pipeline.

Power Plant Lifting Equipment Certification2022

客户: Erbil Power

Power Plant Lifting Equipment Certification

Erbil, Iraq

Load testing and certification of cranes, slings and lifting gear ahead of a turbine overhaul.

Storage Tank Calibration & Strapping2023

客户: Basra Oil Terminal

Storage Tank Calibration & Strapping

Basra, Iraq

Geometric calibration and capacity tables for twelve crude storage tanks per API MPMS.

Well Service Unit Commissioning2025

客户: DNO Iraq

Well Service Unit Commissioning

Tawke field

Procurement of spares and full functional commissioning of a coiled-tubing well service unit.

让我们共创您的下一个成功案例

告诉我们您的项目情况,我们的团队将为您规划合适的校准、检验或检测方案。