2024Client: Kar Group
Refinery Instrument Calibration Campaign
Erbil, Iraq
Full plant shutdown calibration of 1,200+ pressure and temperature instruments, all traceable to NIST/UKAS.
Our work
A selection of recent campaigns across refineries, pipelines, petrochemical plants and power facilities — every result fully traceable and standards-compliant.
2024Client: Kar Group
Erbil, Iraq
Full plant shutdown calibration of 1,200+ pressure and temperature instruments, all traceable to NIST/UKAS.
2023Client: Zagros Petrochem
Sulaymaniyah, Iraq
On-site pop-testing and recertification of 340 pressure safety valves across the olefins unit.
2024Client: North Gas Co.
Kirkuk corridor
Ultrasonic and radiographic weld inspection across 85 km of new 24-inch gas pipeline.
2022Client: Erbil Power
Erbil, Iraq
Load testing and certification of cranes, slings and lifting gear ahead of a turbine overhaul.
2023Client: Basra Oil Terminal
Basra, Iraq
Geometric calibration and capacity tables for twelve crude storage tanks per API MPMS.
2025Client: DNO Iraq
Tawke field
Procurement of spares and full functional commissioning of a coiled-tubing well service unit.
Tell us about your project and our team will scope the right calibration, inspection or testing programme.