Barmaan embeds QA/QC engineers and inspectors into industrial projects to make quality measurable, documented and defensible from the first purchase order to mechanical completion. We plan the inspection strategy, control the flow of materials and drawings, witness fabrication and installation, and package the evidence into an auditable dossier.
Whether you are an owner, an EPC contractor or a fabricator, our teams work to your project specification and the governing international codes, catching non-conformities early — where they are cheap to fix — and closing them through a disciplined NCR process.
We develop project Inspection and Test Plans (ITP) and Quality Control Plans (QCP) that map every characteristic to a verification method, acceptance criterion, governing code and hold/witness/review point.
Each plan is tailored to the scope — piping, structural steel, static and rotating equipment, tanks or pipelines — and agreed with the client and third-party inspector before work starts, so responsibilities and sign-offs are unambiguous.
Positive material identification, heat-number and mill-certificate review, and marking transfer ensure that only correct, traceable materials enter the works. We verify EN 10204 3.1/3.2 certificates against the specification and reconcile them to installed items.
Controlled document flow — latest-revision drawings, welding procedures, and calibrated-instrument records — keeps the project working to a single source of truth and prevents obsolete-revision errors.
Our welding QC covers WPS/PQR and welder qualification review, fit-up and root inspection, visual weld inspection, and witnessing of NDE (RT, UT, MT, PT) to ASME IX and AWS D1.1.
For corrosion protection we inspect surface preparation, dew-point and ambient conditions, DFT, adhesion and holiday testing against the project coating specification and standards such as ISO 12944 and NACE/AMPP.
Non-conformities are raised, dispositioned (use-as-is, repair, rework, reject) and closed with clear evidence, root-cause notes and re-inspection records — so nothing quietly slips through.
At completion we compile the Manufacturing Record Book / final documentation dossier: ITPs signed off, material certs, weld and NDE records, pressure-test packs, coating reports, calibration certificates and as-built data — an audit-ready, handover-ready package.
QA (Quality Assurance) is the proactive, system side — the plans, procedures and documentation that build quality in and keep the project auditable. QC (Quality Control) is the verification side — inspection, testing and witnessing that confirm the product actually meets the specification. Barmaan provides both, integrated.
Yes. We align every ITP and inspection activity to your project specification, client requirements and the governing codes, and we coordinate hold, witness and review points with any nominated third-party inspection agency or notified body.
Yes — at completion we compile a structured Manufacturing Record Book (MRB) containing signed ITPs, material certificates, welding and NDE records, pressure-test packs, coating and calibration reports, and NCR closeouts, ready for client and authority audit.
Typically ASME BPVC Section IX and AWS D1.1 for welding, ASME B31.3 for process piping, and ASNT SNT-TC-1A qualification levels for NDE personnel, with methods (RT, UT, MT, PT, VT) applied per the project code and acceptance criteria.
Tell us what you need and our engineering team will prepare a tailored proposal.